Case Study 03

Scope Of Work Confectionary facility migration works
Schedule £2.4 Million

Case Study

Project overview: Full mechanical and electrical design works associated with the removal, refurbishment and re-installation of plant and equipment. Ownership of the M&E overall design, project management and health and safety needs.

  • Detailed survey of existing assets along with a detailed decommissioning and reinstallation plan.
  • Capturing all the refurbishment requirements and managing their implementation.
  • Managing the revised layout and installation needs for the new location.
  • Design and installation of all process pipework, including; gas, steam, condensate, product additions, mixers, blending, pneumatics and hydraulic needs.
  • Platform/mezzanine steelwork, structural design, associated calculations, fabrication and installation to meet the site’s operational and engineering needs.