Case Study 02

Scope Of Work Food production facility enhancement
Schedule Circa £3.8 Million

Case Study

Project overview: Factory extension from conception through to implementation and handover/completion.

  • Building base design, calculations and CAPEX build.
  • Utilities design including load calculations, services drawings and associated matrix.
  • Process and plant drainage design.
  • Process pipework and all associated installation needs.
  • Main electrical distribution design, installation and testing.
  • All process related electrical installation works through to final commissioning.
  • Full commissioning support and management of specialist OEM engineers.
  • Management and meeting all site needs for training of relevant site personnel.
  • Ownership of meeting CDM needs associated with the project and site.
  • Fully documented client handover, including detailed health and safety and technical file.