Vogal Group deliver M&E Projects.

Vogal Group was tasked by a food production customer to help improve their facility, with a factory installation project, as part of a wider programme to reduce their environmental impact. We completed several mechanical tasks including the new pipework installation associated with two new biomass boilers. This also involved integrating three existing gas boilers and two other biomass boilers, already installed on the site. Additionally, we modified the pipework installation around four 250,000 litre storage tanks, holding one million litres of hot water, so they were correct for the new pipes that we had installed. We also installed a steam turbine as part of the works on site.

In a separate industrial installationproject, we installed a bioenergy Plant with the related pipework to support the installation of a low carbon, heat and power solution. The bioenergy Plant had been designed and included a 1.5MW Combined Heat and Power (CHP) system. We integrated the CHP by identifying the safest and most efficient route for the pipework, prior to installation of the pumps and control valves, so all waste heat could be efficiently recovered.

The customer can now heat 16 hectares of greenhouses, for the production of vegetables, with lower operational costs. Another mechanical equipment installation installed on time and within budget by Vogal Group.

Please Contact us if you need help with your industrial installation project or in improving the infrastructure on your site.

This site uses cookies. By continuing your visit, you accept their use as set out in our Cookie Policy. OK