Vogal Group deliver M&E Projects.

We recently completed a project that was a good example of our mechanical design and industrial installation teams working together to provide a holistic service for a food sector manufacturer.

Our customer wanted to replace a product tank assembly and tasked Vogal Group with installing the new vessel along with the installation of all the associated pipework. The purpose of the project was to save steam on beet cost and reduce the secondary downtime for cleaning the heaters. This has lowered the carbon footprint and significantly reduced the cost of sugar production.

We designed the product inlet and outlet pipework with the inclusion of a bypass line (the non-yellow sections of pipework in the drawing below). The yellow pipework was the existing pipework that was not changed but was connected to the new Vogal Group designed pipework. The pipework was modelled and drawn using SOLIDWORKS based on dimensions taken from site surveys and existing site drawings of the tank and the surrounding steel work.

If you need external mechanical design and industrial installation support, please Contact us

This site uses cookies. By continuing your visit, you accept their use as set out in our Cookie Policy. OK