Vogal Group managed this turnkey engineering project to complete a factory refurbishment. We removed old systems from the building, reconditioned the building interior and carried out equipment relocation and machinery installation. The electrical turnkey project element involved fitting a fully compliant electrical installation (new transformers, extractor units, distribution boards and industrial lighting installation).
As this turnkey M&E installation was a new process for the UK, we worked closely with international suppliers to source the new machinery before we installed them. Our team also completed the pipework installations including compressed air, chilled water and domestic hot water pipework.
Much of our work addresses a ‘problem’ faced by a manufacturer. In this case, the safe and efficient disposal of old carpets and surplus carpet material is an environmental problem for the UK carpet industry. Approximately 500,000 tonnes of end-of-life carpet are produced in the UK every year. The majority is currently either burnt for energy or sent to landfill. If sent to a landfill site, the synthetic materials used in carpets can take thousands of years to decompose and contributes significantly to global warming.
Our customer is a UK based manufacturer of recycled polypropylene, which can be extracted from end-of-life carpet. They have created a process that provides a more sustainable solution. It handles 12 tonnes of carpet material a day now and produces reclaimed polypropylene fibre and pellets for use in a wide range of products and manufacturing industries.
If you need help with your turnkey M&E installation or a turnkey electrical project, please Contact us